Skip to Main Content U.S. Department of Energy
Sensors & Electronics

Sensors & Electronics

Electronics & Systems

Facility Operation Characterization (44)

Information Infrastructure Graphic

Problem: Survey facility infrastructure relations and effectiveness of functional interactions

Project Activity Scope (from Technical Overview Chart): Interaction Mechanisms through Measurement and Analysis System Applications

PNNL Solution:

  • Establish facility’s physical condition
  • Establish effectiveness of information exchange and individual job needs
  • Measure baseline process efficiency
  • Ascertain cost structure and real time cost dissemination requirements
  • Develop an integrated, value-added strategy to drive all aspects of existing facility functions toward the same goal.

Capabilities Employed to Meet Client Needs: Process characterization via staff interviews, procedure review, system design examination and on-site system examination; efficiency diagnostics; condition monitoring; root cause analysis; data acquisition system development; software development; data presentation and interpretation; staff training on site system/methods deployment.

Selected Links to Related Information:

Contact: Richard Meador

Sensors & Electronics

Related Information

Search S&E

Electronics & Systems

Electronics & Systems

S&E Website Contacts